The ceiling treatment is done! Over the last week or so the guys finished the kitchen. And it looks like the electrician finished the rough-in for the ceiling lights in the kitchen too.
The sleeping porch ceiling is complete as well.
On the outside of the house, the broken concrete that was directing water under the house was removed and the driveway was leveled off.
Here's a brief clip of the patio being removed, courtesy of our contractor Terry:
The wood for the front porch was primed.
The boards are now ready for installation.
I know the windows and trim are mostly finished too, but I don't have any pictures right now. We are probably heading out there on Sunday and will have more photos. Dad says that the windows work so well, you can lift them with one finger. In addition to all of this activity, Mom and Dad were finally able to mow. With so much rain, it's been difficult to find a day dry enough to get out there.
That's all from Wisteria Bend for now.
~Christy